by dev_5y3m8g | Jul 31, 2024 | Past Projects
Keystone Utility Systems was awarded Adrian MN and partnered with Allegiant Utility Services. KUS was very proud to be involved in such a project that executed very smoothly. It was a good project for one of our Project Managers to take on single handedly and did a...
by dev_5y3m8g | Jul 31, 2024 | Past Projects
Keystone Utility Systems was selected by Northern Douglas County to perform water meter replacements for approximately 1,600 residents in the nearby suburb of Denver. This was a mandatory meter replacement project that required access to customers homes and an...
by dev_5y3m8g | Jul 31, 2024 | Uncategorized
Keystone Utility Systems partnered with Itron to provide a turn-key AMI upgrade to Lubbock, TX, and all their 80,000 water customers. This project did not require appointments for residential water meters. KUS has had a strong history with Itron and successfully...
by dev_5y3m8g | Jul 31, 2024 | Uncategorized
Keystone Utility Systems was selected by Cottonwood, CO to perform water meter replacements on approximately 1,400 residents in the area. This was a mandatory meter replacement and required access to customer homes and scheduled appointments to be set with our call...
by dev_5y3m8g | Jul 31, 2024 | Uncategorized
Keystone Utility Systems was awarded a contract to install new AMI water meter systems for the city of Wheatland, CA. The city of Wheatland chose Mueller Systems network and metering system to replace the 1,200 existing water meters. This project began the first of...